Sears 661.62392 Air Conditioner User Manual


 
INSTALLATRON
LIFTING COOLER
CAUTION: DO NOT LIFT ON THE LOUVERS,
REMOVE THE LOUVERS BEFORE LIFTING,
DO NOT LIFT ON THE CENTER OF THE
CABINET FLANGES
MOUNTING COOLER (Fig. 7)
1o Prepare duct to fit model used,, See outtet size
specifications on page 3.
2. Cut opening in roof or wall to fit duct opening on
cooler and box in opening=
3. Install duct and secure to boxed-in opening
frame= Allow the two inches to fit into cooler
outlet. Allow duct length for cooler bottom to be
4 inches above roof at closet poiqL
4 Install flashing on roof or' wall to prevent water
entry,,
5 Measure cooler and lay out mount location.
Lift at cabtnet corners
The cooler may be Ilfted by
putting a bar or strap through
the panel hole and lifting by
means of the beror strap (Fig
6)
I NOTE: THE BOTTOM EDGE NEAREST THE AIR
OUTLET MUST FACE UP THE ROOF.
6,, Mount cooler on stand or pad Cooler must be
level front to back and left to righL Sears roof
stand kits are available..
7o Be su re to securely fasten four corners of cooler
to stand or pad.
8. Caulk duct to the cooler, Caulk the flashing°
_/4 MAXIMUM HEIGHT FOR
STAND SIDE EDGE TO
ALLOW RESERVOIR CLEARANCE
FLASHING
)UCT
L SPACER
ABOUT 1"THICK
PAD
FLASHING
8OXED OPENING
RtS
ROOF STAND KIT
(PURCHASE SEPARATELY)
4 INCHES
MINIMUM
2 iNCHES
- FLASHING
RISER DUCT