10
MANUAL FLUSH OPERATION
In the event of an electrical failure, the ush ball can be manually operated to clear the bowl. We recommend using
a long-neck screwdriver or 7/16-in. socket for the operation shown below. NEVER PRY OPEN THE FLUSH BALL
FROM INSIDE THE TOILET BOWL. Damage to the ush ball and bowl seals may result.
2. Locate hole on left side
of china toilet. This al-
lows access to the ush
valve motor drive arm.
3. Insert screwdriver or
7/16-in. socket through
access hole and onto hex
head.
4. Turn screwdriver or
socket wrench counter-
clockwise. This will open
ush ball and allow bowl
contents to clear. After
bowl is clear, turn screwdriver or socket wrench clockwise
to return ush ball to original position.
1. Remove PC board
access cover. Place
Mode Switch in the
“Manual Override” posi-
tion. This disconnects
ush valve motor brake
from electrical circuit.
NOTES:
Water will not enter the toilet bowl during manual ush
operation.
Place Mode Switch in the “Normal” position before
returning to automatic operation.
Manual Override
position
TOILET SYSTEM ELECTRICAL SPECIFICATIONS
12VDC 24VDC
Maximum standby current (amps): .080 .080
Maximum operating current (amps): 6.5 2.5
Flush motor locked rotor current (amps): 14.5 7.25
Maximum voltage 15 30
Minimum voltage: 10 20
Input power wire size 14 ga. 14 ga.
All other wires size: 18 ga. 18 ga.
Fuse size (amps) 8 4
NOTES: Standby current includes ush panel status light.
Operating current does not include vacuum pump or other sanitation system components.