Schneider Electric ACECFR40101SE Fan User Manual


 
13EcoBreeze System Installation
Installation
Lifting and Rigging
EcoBreeze Frame. The EcoBreeze Frame is not equipped with forklift pockets. Lift and rig only
from the four upper ISO corner blocks on each EcoBreeze Frame using a crane.
Recommended horizontal sling angles are greater than 45 degrees. Lifting equipment must be
rated for at least 18 144 kg (40,000 lb) for lifting a 12.2 m (40 ft) Frame, and at least 12 247 kg
(27,000 lb) for a 6 m (20 ft) Frame.
WARNING
DAMAGE TO EQUIPMENT OR PERSONNEL
Do not remove tension rods until the EcoBreeze Frame is placed and secured on
its supports.
Before lifting the EcoBreeze Frame, ensure the lifting equipment is adequately
sized for the load.
Lift and rig the EcoBreeze Frame from the top four ISO corners only.
Move the EcoBreeze Frame directly from the truck to its permanent foundation. If
the Frame must be placed elsewhere temporarily, it must be placed on a flat and
level surface in order to avoid damage.
Check for overhead obstructions such as power cables.
Maintain a minimum safe distance while equipment is hoisted.
Control access of personnel at lift site.
Failure to follow these instructions can result in death, serious injury, or
equipment damage.