Schneider Electric ACECFR20101SE Fan User Manual


 
EcoBreeze System Installation2
Inspecting the Equipment
Inspect for missing components. All shipped loose components are identified by part number
and description on the bill of lading. Ensure each item is present before accepting delivery of
the unit.
Filing a claim. If damage has occurred, or if shipped loose parts are missing, report it
immediately to the delivering carrier and note the problem on the receiving copy of the bill of
lading. Failure to do so will result in replacement parts and repairs being billed to the customer.
In case of shipping damage, do not operate the equipment. Keep all packaging for inspection
by the shipping company and contact Schneider Electric.
Storing the equipment before installation
Heavy: Ensure the lifting equipment has sufficient capacity for the load.
The recommended tools for moving the equipment include the following:
WARNING
DAMAGE TO EQUIPMENT OR PERSONNEL
Do not remove tension rods until the EcoBreeze™ Frame is placed and secured on
its supports.
Move the EcoBreeze Frame directly from the truck to its permanent foundation or
supports. If it must be stored temporarily, it must be placed on a flat and level
surface to avoid damage.
Leave the protective plastic wrap in place until you are prepared to install the
equipment.
Failure to follow these instructions can result in death, serious injury, or
equipment damage.
Crane
(Frame,
ductwork)