Sanyo SPW-XR254EH56 Air Conditioner User Manual


 
8
2-5. Checking the Drainage
After wiring and piping are completed, use the follow-
ing procedure to check that the water will drain
smoothly. For this, prepare a bucket and wiping cloth
ready to catch and wipe up spilled water.
Do not supply power to the
unit until the tubing and
wiring to the outdoor unit
are completed.
(1) Take off the tube cover and through the opening,
slowly pour about 1,200 cc of water into the drain
pan to check drainage.
(2) Do Test Run to check the drainage after complet-
ing installation. When performing Test Run, be
sure to observe the Test Run procedure.
Be careful since the fan will
start turning when checking
the drainage.
(3) After drain checking is finished, return the
Operation Selector switch to the RUN position
(ON position
) and remount the tube cover.
To mount the tube cover,
use 4
××
××
× 8 tapping screws. Do
not use long screws as they
may puncture the drain pan
and cause water leakage.
CAUTION
CAUTION
Fig. 2-12
4 × 8
tapping screw
Tube cover
Siphon
2263_X_I