Samsung AD18B1C09 Air Conditioner User Manual


 
E-
50
C
OMPLETING THE
I
NSTALLATION
In case of unit A test, push once the PCB switch S/W-A
(same for unit B).
- In such a case, the indoor unit of unit A is operated automatically
by the outdoor unit.
- In case the unit A test stops, push once more the switch S/W-A.
< Operation >
1. Once the test is started, the COMP is on and Good (displayed Gd)
or Error (displayed Er) is displayed after 4 minutes .
: Taking difference between the present temperature of indoor heat
exchanger and the temperature 4 minutes later, if the temperature
difference is over 41˚F(5°C), the connection is good or if the temperature
difference is below 41˚F(5°C), the connection is bad.
2.
If the result of the test operation is good operation, is possible for 30 minutes max.
If there is an error, the outdoor unit shall be stopped immediately.
If an error occurs, push switch S/W-A or S/W-B once to resume
from the error status. Restart is then possible.
3. Once the test operation is completed, push switch S/W-A or S/W-B
to finish the test.
4. Once the test is completed, operate the indoor unit normally.
5. Check the operation is normal. Start up is over.
4 Check the test operation status by pressing the PCB switch
S/W-A and S/W-B of outdoor unit.
Check the operation status by pushing the switch one at time.
Perform the test operation only for the unit selected last.
Check the pipe pressure and the other operation status during
the test operation.
Check items when the error occurs during the test operation (each unit)
- Check there is enough refrigerant.
- Check pipe connections.
EE
EE
XX
XX
AA
AA
MM
MM
PP
PP
LL
LL
EE
EE
CB
TEST OPERATING
c
b
a
A
OUTDOOR UNIT
a : PCB display
b : Red LED
c : PCB switch
Checking and Testing Operations (Cont.)