Samsung AW189CB Air Conditioner User Manual


 
Always have an assistant to help you. Never attempt to install
any air conditioner alone.
You risk the possibility of hurting yourself or injuring others by
attempting to install it alone.
Preparation for Installation
1 Carefully remove the unit from the packing case and lay it on
the floor and check that all accessories (as indicated) are enclosed.
2 Check the cabinet and front grille of the unit for any defects such as
scratches.
3 Be sure to check the power supply.
Refer to the specifications on the label attached to the unit.
Checkpoints Prior to Installation
Installation Conditions
G ETTING STARTED
Electrical Requirements
For personal safety:
This appliance must be properly grounded.
Do not, under any circumstances, cut or remove the third grounding
prong from the power cord.
We recommend that you do not use an extension cord or an
adapter plug with this appliance.
Do not change the plug on the power cord of this appliance.
Follow national electrical codes or local codes and ordinances.
1
If the electric supply provided does not meet the above
specifications, call a licensed electrician.
Aluminum house wiring may pose special problems -
consult a qualified electrician.
This unit requires a separate circuit, serving only this appliance.
115V
15 AMP circuit
"parallel" type
230-208V
20 AMP circuit
"perpendicular" type
230-208V
15 AMP circuit
"tandem" type
230-208V
30 AMP circuit
"tandem" type
E-22