Samsung AM26B1C13 Air Conditioner User Manual


 
E-48
Checking and Testing Operations
C
OMPLETING THE
I
NSTALLATION
To complete the installation, perform the following checks and tests
to ensure that the air conditioner is operating correctly.
1 Review all the following elements in the installation:
Installation site strength
Piping connection tightness to detect any gas leakages
Connection wiring
Heat-resistant insulation of the piping
Drainage
Earthing wire connection
Correct operations (follow the steps below)
2 Press the On/Off button.
Result:
The indicator lights on the indoor unit flash at
half-second intervals.
While the indoor unit opens, the indoor unit fan runs
to start.
3 Press the button.
Result: The outdoor unit operates in cooling mode as
following the room temperature.
4 Air flow direction Press the button and check that the air
flow blades work properly.