Rinnai Q205SN Boiler User Manual


 
Operating instructions Rinnai Q-Series
12
Replenishing the central heating system
The central heating installation needs to be lled with potable (drinking)
water. For topping up the installation you use the lling loop according to the
following procedure:
Contact your installer if your installation is not
providedwithallingloop.
1 Switch all functions off (heating, DHW and pump);
2 Briey push the 'STEP'-button: P x.x = water pressure in PSI;
3 Slowly open the lling loop (Indication on display increases);
4 Fill up slowly to between 22 and 25 PSI;
5 STOP appears on the display;
6 Close the lling loop;
7 De-aerate the complete installation , start at the lowest point;
8 Check the water pressure and if necessary top it up;
9 Close the lling loop;
10 Activate functions required (heating , DHW and/or pump );
11 If A xx appears on the display, wait for 17 minutes;
12 Check the waterpressure and if necessary top it up to 22 to 25 PSI
13 Close the lling loop;
14 Press the ‘STEP’-button;
15 Be sure that the lling loop is closed.
After the automatic de-aeration programm (A xx) is nished the boiler will
return to the Good reading or Technical reading.
NOTICE
i