6
1. Line up vacuum port in top assembly
with drain cap located on the front of
the drum.
2. Place lid on top of drum with the drum
latches snug against the drum
channel.
3. Be sure lid completely covers the top
of the drum so leakage does not
occur.
4. Push down on top of the drum latch
areas to cause the flexible locking
tabs to hook onto the drum lip of the
channel.
5. Make sure that the locking tabs are
snapped in place to prevent the lid
from coming off. (See inset).
Your new Wet/Dry Vac is ready for use.
Wet/Dry Vac Assembly
Drum
Out
Flexible
Locking Tab
Drum
Channel
Top
Assembly
Push
Down
Pull Out
Flexible
Locking
Tab
Push
Down
Pull Out
Flexible
Locking
Tab
Cord Storage
Simply, wrap the power cord around the
power head and snap the connector on
the plug to a wrap of the cord.
Insert Hose
Insert the push button end of the “Tug-a-
Long” hose into the inlet of the vac. The
hose should snap into place. To remove
the hose from the vac, press the release
button in the hose assembly and pull the
hose out of the vac inlet, as shown.
Release Button
Pull Handle
Caster
Drain
Cap
Caster Feet
w/Accessory Storage
Drum
Power
Cord
Cord Wrap
Area
Blower
Port
SP6663 12 GALLON.qxd 3/16/07 8:57 AM Page 6