Regency P36-NG4 Indoor Fireplace User Manual


 
Framing and Finishing
1) Determine the total thickness of facing material (e.g. drywall plus
ceramic tiles) to allow the fi nished surface to be fl ush with the front
of the unit. Total facing thickness can vary from 1/2” (13mm) to
1-1/4” (32mm) thick.
2) Frame in the enclosure for the unit with framing material.
Note: Header for the P36 must be installed vertically to maintain
clearances to combustible materials. Non combustible header may
be installed horizontally.
3) For exterior walls, insulate the enclosure to the same degree as
the rest of the house, apply vapor barrier and drywall, as per local
installation codes. (Do not insulate the fi replace itself.)
4) The top of the unit must not be closer than 32” (813mm) to the
ceiling.
5) Combustible material may be brought up to the top and sides of
the unit and be covered with ceramic tiles, bricks, rock or other
suitable combustible fi nishing materials.
If using the Barcelona Surround, Kensington, Balmoral, or
Tripoli Screen Door please note that framing and facing must
be non combustible (12” on top and 6” on both sides) and that
the Barcelona is only approved for installation with a single
sidewall.
Note: The unit does not have to be completely enclosed in a
chase. The clearance on top of the unit is 0” to the standoffs
so combustible building materials can be laid directly on top
of the standoffs. You must maintain proper clearances from
the vent to combustible materials (See Below).
6) Use metal studs for framing where the minimum clearance from
the vent to combustible material cannot be maintained.
Drywall
Mantel Clearances
2
0
12
6
4
810
0
Side View
Top of
Unit
12" (305mm)
3-1/2" (89mm)
7-1/2"(191mm)
A
To base
of Unit
Standoff
B
C
D
6" Side Wall
5"
2"
Mantel leg
Mantel leg
P36 - P36D
Allowable mantel leg
projection.
3"
1-1/2"
8" Single Sidewall when using the Barcelona Surrround
Mantel Clearances
ABCD
with Flush Glass or
Hampton Cast
30-1/2”
(778mm)
14” (356mm) 10” (254mm) 7” (178mm)
with Bay Option
30-1/2”
(778mm)
13” (330mm) 10” (254mm) 7” (178mm)
with Flush Glass and
Barcelona Surround
30-1/2”
(778mm)
17” (432mm) 12” (305mm) 8” (203mm)
with Tripoli Screen Door,
Kensington, or Balmoral
Front
30-1/2”
(778mm)
20” (508mm) N/A 12” (305mm)
P36 - P36D Gas Fireplace
Combustible Mantels
Because of the extreme heat this fi replace emits, the mantel
clearances are critical. Combustible mantel clearances from top of
the louvers are shown in the diagram below. Mantel may be installed
anywhere in the shaded area or higher.
Note: If desired a non-combustible mantel may be installed at a
lower height.
Note: Ensure the paint that is used on the mantel and the facing
is “heat resistant” or the paint may discolour.
Mantel Leg Clearances
Combustible mantel leg clearances as per diagram below:
Clearances are from the fi nished edge of the unit or an installed front.
Maximum
1-1/2” projection at 2”
minimum clearance.
WARNING
Failure to maintain required clearances is a major cause of
chimney related fi res. Installation of this fi replace must comply
with these clearances.
Clearance: Dimension Measured From:
A: Mantel Height 7” (178mm) Minimum (Additional on this page)
B: Sidewall 6” (152mm) Side of installed front
Sidewall: Barcelona Only
8” (203mm)
Approved for single sidewall only
C: Ceiling 32” (813mm) Top of installed unit
D: Mantel Depth 12” (305mm) Maximum (Additional on this page)
E: Alcove Width 48” (1219mm) Sidewall to Sidewall (Minimum)
F: Alcove Depth 36” (914mm) Front to back wall (Maximum)
Top of Hearth must not be higher than the base of the fi rebox.
Vent Clearances Clearance Dimension
Horizontal - Top 2” (51mm)
Horizontal - Side 1-1/2” (38mm)
Horizontal - Bottom 1-1/2” (38mm)
Vertical (Flex or Rigid) 1-1/4” (32mm)
E
B
B
A
C
D
F
Clearance Requirements
36 June 2007 Regency Product Specifi cations Book
Gas Fireplaces
Gas Fireplaces