Raypak 3001 Boiler User Manual


 
ELECTRICAL DATA
Adjustable Timing: 3 to 10 minutes (Factory set at 7 minutes)
Input Power (Primary): 24 VAC 50/60 Hz
Input Signal (Controller): 24 VAC or 120 VAC
Output (SPST Relay): Load - Up to 10 Amp-120 VAC Single Phase*
Ambient Temperature: -67°F to +158°F
* Motors larger than 3/4 HP and three-phase current require a contactor or motor starter
equipped with a 120 VAC coil.
SUGGESTED SPECIFICATION
The Economaster II pump delay controller shall maintain pump operation until all usable heat
from the combustion chamber is absorbed into the system or storage tank. It shall be adjustable
from 3 to 10 minutes to facilitate fine tuning to the specific system.
©RAYPAK, INC., 2151 Eastman Ave, Oxnard, CA 93030 (805) 278-5300 Fax (800) 872-9725
www.raypak.com
Litho in U.S.A.
Raypak, Inc. reserves the right to make product changes or improvements at any time without notice.