Quasar HQ-2244UH Air Conditioner User Manual


 
11
Features and Installation
Foam-PE
Top retainer bar
Top retainer bar
Foam-PE
Screw
(Type A)
Screw(Type A)
Shipping screws
Lower guide
PREPARATION OF CHASSIS
1. Remove the screws which fasten the cabinet at
both sides and at the back.(See Fig. 1)
2. Slide the unit out from the cabinet by gripping the
base pan handle and pulling forward while
bracing the cabinet.(See Fig. 2)
3. Cut the window sash seal to the proper length.
Peel off the backing and attach the Foam-PE to the
underside of the window sash.(See Fig. 3)
4. Remove the backing from Foam-PE with 3 holes
and attach it to the bottom of the Top retainer
bar.(See Fig. 4)
5. Attach the Top retainer bar on the top of the
cabinet with 3 screws (Type A).(See Fig. 4)
6. Insert the Frame Curtain into the Top retainer bar
and Lower guides.(See Fig. 4)
7. Fasten the curtains to the unit with 10 screws
(Type A) at both sides.(See Fig. 4)
Suggested Tool Requirements
SCREWDRIVER(+, -), RULER, KNIFE, HAMMER, PENCIL, LEVEL
Fig. 1
Fig. 2
Fig. 3
Fig. 4