Quartz 06617645-02 Water Heater User Manual


 
06617645-02
25
Installation Instructions – General
- When installing or servicing the unit, you must follow the instructions given in this manual and on labels
attached to the unit.
- As the chiller is charged with refrigerant under pressure and unauthorised access to the electrical
components provides a shock hazard, any work performed on the unit must be by suitably trained
personnel only.
- Failure to observe the instructions provided in this manual, or any modification of the unit without explicit
previous authorisation, will invalidate the warranty.
Attention: before servicing the unit ensure that the electric supply is disconnected.
Inspection
After receiving the unit, immediately check its integrity. The unit left the factory in perfect condition; any
eventual damage must be reported to the carrier and be recorded on the Delivery Note before it is signed.
TEV Ltd must be informed, within 8 days, of the extent of the damage. The customer should prepare a
written statement of any severe damage: digital photos of any damage is useful.
Lifting and site handling
When unloading the unit, care must be taken to prevent damage to the refrigerant circuit, condensing coils
or unit casing.
When using a crane, pass bars through the base frame lifting holes (marked with yellow arrows) and attach
the cable or chains to these bars. Ensure that they are clamped firmly. Protect the sides of the chiller with
boarding or material of a similar nature.
Forklift forks must be inserted in the base pallet: care must be taken to prevent them hitting the base or
panels. Keep the unit horizontal to avoid damage to the internal components.
IMPORTANT: be sure that the method of lifting does not allow the unit to slip from chains or slings,
turn over or slide from lifting devices.
Unpacking
When unpacking, be careful not to damage the unit. The packing is made up of different materials: wood,
cardboard, polythene etc. We recommend that they are sent to a re-cycling centre in order to reduce their
environmental impact.
LOCATION AND MINIMUM CLEARANCES
QLAC units are designed for external installation. Any overhang or cover above the unit should be avoided
as this can cause air re-circulation. It is advisable to create a firm base for the unit, with a size similar to unit
foot-print. Normal unit vibration levels are very low: it is good practice, however, to fit a rigid rubber interface
between base and unit frame. Where desirable, fit anti-vibration mounts (spring or rubber), to keep vibration
to a minimum. For future maintenance, these clearances are recommended:-
Mod. A B C D E
040
1000 800 800 800 3000
045
1000 800 800 800 3000
050
1500 800 800 800 3000
060
1500 800 800 800 3000
070
1500 800 800 800 3000
080
1500 800 800 800 3000
090
1500 1000 1000 1000 3000
110
1500 1000 1000 1000 3000
120
1500 1000 1000 1000 3000
130
1500 1000 1000 1000 3000
140
1500 1000 1000 1000 4000
160
1500 1000 1000 1000 4000
190
2000 1000 1000 1000 4000
210
2000 1000 1000 1000 4000
240
2000 1000 1000 1000 4000
260
2000 1000 1000 1000 4000
300
2000 1000 2000 2000 5000
320
2000 1000 2000 2000 5000
380
2000 1000 2000 2000 5000
430
2000 1000 2000 2000 5000
500
2000 1000 2000 2000 5000
Warning: The unit should be installed such that there is suitable access for maintenance and/or
repair.