Quadra-Fire GARNET-D-CWL Electric Heater User Manual


 
August 1, 2008
Page 17Quadra-Fire · Garnet-T · 7016-127F
Step 8.
Slip the storm collar over the pipe, and push it down to the
top of the flashing (Figure 5.15). Use non-hardening sealant
above and below the joint between the storm collar and the
pipe.
Optional High Wind Termination Cap
Secure Flashing with Non-Hardening
Sealant and Roofing Nails
Figure 5.15
Ceiling Firestop
Nails
Minimum 1 in.
(24mm) Clearance
Minimum 1 in.
(24mm) Clearance
Minimum 1 in.
(24mm) Clearance
Minimum 1 in.
(24mm) Clearance
Figure 5.16
Fire Risk.
Explosion Risk.
WARNING
Any occupied areas above the first floor, including
closets and storage spaces, which the vertical
vent passed through must be enclosed. The
enclosure may be framed and sheetrocked with
standard construction materials; however, refer
to these installation instructions for the minimum
allowable clearance between the outside of the
vent pipe and the combustible surfaces of the
enclosure. Do not fill any of the required air space
with insulation.
Step 9.
Twist-lock the vent cap and seal.
Note: For multi-story vertical installations, a ceiling firestop
is required at the second floor, and any subsequent floors
(Figure 5.16). The opening should be framed to 10 in. x
10 in. (254mm x 254mm) inside dimensions, in the same
manner as shown in Figure 5.13.