PVI Industries PV 6114 6/03 1 Boiler User Manual


 
PV 6114 6/03 2
SPECIFICATION FOR DOMESTIC WATER HEATERS
Power Combustion, Gas/Oil Fired Water Heaters with Nickel-Plated Storage Tanks
(continued)
Safety Controls
As a minimum
, the heater will be equipped with the following:
electronic flame safeguard with pre-purge (600,000 to 3,200,000 Btu/h burners)
two immersion operating thermostats
an immersion temperature limiting device
an ____ ASME or ____ AGA-rated temperature and pressure relief valve
and options as selected on form PV 6000
Warranty Summary
Storage tank: _____ year (10 standard, 20 optional) Covers manufacturing or material defects,
leaks and /or the production of rusty water. Tank coverage will include
failure due to scale buildup for ____ full years (5 standard, 8 optional) and
____ prorated years (5 standard, 12 optional) with no provision or condition
for maintenance or inspections and no limitations on water chemistry.
Heat exchanger
and combustion chamber: 5 year. Covers manufacturing or material defects, leaks, and/or the
production of rusty water.
Burner and all heater parts: 1 year
The heater will have a _____ first year or ____ long-life service policy, which will cover replacement labor and freight
costs under certain conditions. Initiation and /or continuation of warranty coverage will not
be dependent upon annual
inspections, regular replacement of anode rods, or water chemistry. Complete copies of all warranties and service
policies, including all exclusions and conditions, will be presented to the owner as part of the submittal package. These
summaries are not warranties. Consult warranty and policies for full details.
Finishing
The storage and heating sections will be completely factory packaged, requiring only job site hookup to utilities,
venting, and plumbing. The heater will be insulated, jacketed with enameled steel panels, and mounted on heavy-duty
channel skids. The heater will fit properly in the space provided and installation will conform to all local, state, and
national codes.
Start Up
Start up on the unit will be performed by factory trained and authorized personnel. A copy of the start up report will
be provided to the owner.