ENGINEERING STANDARD PROCEDURE
IMPELLER INSTALLATION – TECH BULLETIN
1of 2
DOCUMENT NBR. :
PED-016
REVISION:
1
EFFECTIVE
DATE:
09-26-2003
0 NEW UJB 08-15-02
1 ADDED250LH UJB 09-26-03
REV ECN CHANGE DESCRIPTION BY APPV’D DATE
1.0 SCOPE: The purpose of this Engineering Standard Document is to define the procedure to be
followed in installing the Impeller and Impeller Lock Screw.
2.0 METHOD:
2
2
.
.
1
1
–
–
I
I
m
m
p
p
e
e
l
l
l
l
e
e
r
r
I
I
n
n
s
s
t
t
a
a
l
l
l
l
a
a
t
t
i
i
o
o
n
n
Clean all parts prior to impeller installation.
Apply “Never Seize” or similar to Impeller bore, Shaft and
Key.
Install Impeller onto Shaft. Using a grease remover or
solvent, remove all grease, oil or preservative from the shaft-
end internal threads and dry.
2
2
.
.
2
2
–
–
I
I
m
m
p
p
e
e
l
l
l
l
e
e
r
r
B
B
l
l
o
o
c
c
k
k
i
i
n
n
g
g
Position an Open End or Box / Open End Wrench Using one
of the Strainer Bolts as shown. Place a piece of Wood
between the Impeller and Wrench.
Note: Reverse Wrench Location to opposite side for Impeller
removal.