Panasonic CS-C12DKU Air Conditioner User Manual


 
10.6.4. EVACUATION OF THE EQUIPMENT
WHEN INSTALLING AN AIR CONDITIONER, BE SURE TO EVACUATE THE AIR INSIDE THE INDOOR UNIT AND PIPES in the
following procedure.
1. Connect a charging hose with a push pin to the Low side of a charging set and the service port of the 3-way valve.
Be sure to connect the end of the charging hose with the push pin to the service port.
2. Connect the center hose of the charging set to a vacuum pump with check valve, or vacuum pump and vacuum pump adaptor.
3. Turn on the power switch of the vacuum pump and make sure that the needle in the gauge moves from O PSI to -14.5 PSI.
Then evacuate the air approximately ten minutes.
4. Close the Low side valve of the charging set and then turn off the vacuum pump. Make sure that the needle in the gauge does
not move after approximately five minutes.
Note: BE SURE TO FOLLOW THIS PROCEDURE IN ORDER TO AVOID REFRIGERANT GAS LEAKAGE.
5. Disconnect the charging hose from vacuum pump and from the service port of the 3-way valve.
6. Tighten the service port caps of the 3-way valve at a torque of 4.05 Pf with a torque wrench.
7. Remove the valve caps of both of the 2-way valve and 3-way valve. Position both of the valves to “OPEN” using a hexagonal
wrench (5/32”).
8. Mount valve caps onto the 2-way valve and the 3-way valve.
Be sure to check for gas leakage.
Caution
If gauge needle does not move from 0 PSI to -14.5 PSI, in step 3 above take the following measure:
If the leak stops when the piping connections are tightened further, continue working from step 3.
If the leak does not stop when the connections are retightened, repair the location of leak.
Do not release refrigerant during piping work for installation and reinstallation. Take care of the liquid refrigerant, it may cause
frostbite.
42
CS-C9DKU CU-C9DKU / CS-C12DKU CU-C12DKU