6
W415-0360 / 11.05.02
DO NOT USE ANY MAKESHIFT MATERIALS
DURING INSTALLATION.
1. Move the stove into position with the flue centered,
midpoint between two joists to prevent having to cut them.
Use a plumb bob to line up the centre.
2. Cut and frame an opening in the roof to provide a 2"
clearance between the outside of the chimney and any
combustible material.
DO NOT FILL THIS SPACE WITH ANY TYPE
OF MATERIAL.
Nail headers between the joist for extra support.
Firestop spacers must be placed on the bottom of each
framed opening in any floor or ceiling that the chimney
passes through.
3. Hold a plumb bob from the underside of the roof to
determine where the opening in the roof should be. Cut
and frame the roof opening to maintain proper 2" clear-
ances.
ADDING CHIMNEY SECTIONS
Add chimney sections, twist lock-
ing (clockwise) securely, to the re-
quired height. The chimney must
extend, at least, 3 feet above its
point of contact with the roof and
at least 2 feet higher than any
wall, roof or building within 10 feet.
FIGURE 6. If your chimney sys-
tem is enclosed within the attic
area, a rafter radiation shield is
required.
PEDESTAL MODELS
OUTSIDE AIR
If possible connect the
air intake at the
pedestal's back or
bottom to the outside
with a 4 inch (100mm)
diameter fresh air kit
available at your
Napoleon/Wolf Steel
Ltd. dealer. Follow
detailed instructions
under "Mobile Home
Outside Air".
MOBILE HOME
INSTALLATION
PEDESTAL MODEL 1100 IS APPROVED FOR IN-
STALLATION IN MOBILE HOMES IN BOTH
CANADA AND THE UNITED STATES.
PEDESTAL MODEL 1400 IS APPROVED FOR IN-
STALLATION IN MOBILE HOMES IN THE
UNITED STATES ONLY.
The pedestal base must be firmly bolted to the floor
with 1/4 inch lag bolts. Minimum clearances to
combustibles are as shown in FIGURE 8.
VENTING
Connect the stove to a
chimney system using
a listed double wall con-
nector, Security DL6
in Canada or Dura
Vent DVL in the U.S.A.
Use chimney system
listed to ULC S629 in
Canada or either of
Simpson Dura-Vent
chimney models SDP
or Dura Tech in the
U.S.A.
The chimney must be
installed in accordance
with the manufacturer's
instructions. Use only
specified components
with no substitutions.
The chimney and pipe
must extend at least 8
feet above the stove and 3 feet above the highest point
of the roof. Install a rain cap at the top which will not
impede the smoke exhaust. The chimney must be sup-
ported at the ceiling or roof so that its weight does not
rest on the stove.
It must be installed between ceiling joists, with radia-
tion shield and roof flashing, so that the structural
strength, insulation and waterproof qualities of the home
are not lessened. Seal with silicone to maintain a va-
pour barrier at the chimney and outside air pipe
penetrations.
UNDERSIDE OF JOIST
FIRESTOP SPACER -
HEADERS
OUTSIDE AIR CONNECTION
HEARTH PAD
THROUGH WALL OR FLOOR
STOVE BOLTED
TO FLOOR
CEILING SUPPORT
TRIM COLLAR
ROOF FLASHING
MOBILE HOME
RADIATION SHIELD
RAIN CAP
FIGURE 5
FIGURE 6
FIGURE 7
FIGURE 8
FIGURE 9
3 FT.
MIN.
10 FT.
2 FT.
MIN.