Monessen Hearth HBDV300 Indoor Fireplace User Manual


 
54D5031 7
B
A
D
F
H
A
E
C
1/2” or 5/8”
C
A
A
C
G
G
1/2” or 5/8”
1/2” or 5/8”
FIREPLACE FRAMING
Firebox framing can be built before or after the appliance is set in place. Construct firebox framing following Figure 2 and
the chart below for your specific installation requirements. See Figure 3 on Page 8 for firebox dimensions. The framing
headers may rest on the top of the firebox standoffs. Do not bring headers below top of standoffs.
The firebox may be installed directly on a combustible floor or raised on a platform of an appropriate height. When the
firebox is installed directly on carpeting, tile, or other combustible material, other than wood flooring, the firebox shall be
installed on a metal or wood panel extending the full width and depth of the enclosure.
Corner Installation
Stud Location
Inside Chase Installation
Figure 2 - Framing Dimensions
300 400
A 33
1
/2" 37
1
/2"
B 37
1
/4" 40
7
/8"
C 28
1
/4" 29
1
/4"
D 14
1
/8" 13
1
/2"
E 55
11
/16" 60
7
/8"
F 27
13
/16" 30
7
/16"
G 13
3
/4" 16
1
/2"
H 39
3
/8" 43
1
/16"
PRE-INSTALLATION INFORMATION
Do not ll spaces around rebox with insulation or other materials. This could cause
a re.
WARNING