MT138A
INSTALLATION INSTRUCTIONS
LAVATORY FAUCETS
Four-Inch Centerset
6" X 2" WIDE
1/2" IPS
THREADED
CONNECTIONS
LIFT ROD
POSITION
USE SPACER TO INSTALL
ON THINNER LAVATORY
BOWLS OR COUNTERS
DISCARD SPACER WHEN
INSTALLING ON THICKER
LAVATORY BOWLS OR COUNTERS
1-3/4"
MAX.
4-3/4"
3-5/8" C.C.
1-3/4"
5" NOMINAL
OPEN
POSITION
5" NOMINAL
OPEN
POSITION
CONCENTRIX HANDLE
CONCENTRIX
HANDLE INSERT
3-5/8" C.C.
1-3/4"
3-5/8" C.C.
1-3/4"
5" NOMINAL
OPEN
POSITION
LEVER HANDLE KNOB HANDLE
With clamp bar, spacer and
mounting nut installed, tilt
clamp bar back as shown,
then drop faucet supplies
down through deck holes and
tighten from below. On decks
thicker than 3/4" you may
have to remove spacer.
Fits 4" centers and through a 1" minimum diameter hole.
All models equipped with a Moen Flow-Rator™.
TILT BACK
CLAMP BAR
8410, 8415, 8416, 8450, 8455
®
Always turn water off before disassembling the valve. Open valve handle to alleviate
water pressure to insure that complete water shut-off has been accomplished.
Before turning water on during either rough-in or trim-out, make sure that the cartridge retainer clip is in place. The cartridge
a nd r et ai n er cl i p w er e pr op er l y i ns t al le d an d t e st ed be f or e l e av in g th e f ac t or y. Although it is u n li k el y, it is n e v er th e le ss pos s ib le
that through the handling of the valve by any number of persons the retainer clip may not be properly installed. This should
be carefully checked at time of rough-in and trim-out. If the retainer clip is not properly installed, water pressure could force
the cartridge out of the casting. Personal injury or water damage to the premises could result.
CAUTION:
CLIP
EAR
Complies with ASME A112.18.1M and CSA B125