18
(A)
Fig.1
OPERATING PROCEDURE PHOTOS
DISASSEMBLY PROCEDURE8
8-1 CONTROL BOX
Be careful removing heavy parts.
1.Removing the control box cover
(1)Remove the fixing screws(two) of the cover(A) and
remove the cover.
(C)
(D),(E)
Fig.1
Fig.2
8-2 THERMISTOR (Liquid piping temperature detection)
OPERATING PROCEDURE PHOTOS
1.Removing the cover
(1)Remove the fixing screws(two) of the cover(C) and
remove the cover.
2.Removing the thermistor
(1)Remove the thermistor(D), from the thermistor
holder(E), which are installed on the copper tube.