Mitsubishi Electronics MU-AWA Heat Pump User Manual


 
18
(2) Time chart
OFF Time
Time
ON
Operational frequency
of the compressor
Commanded
to open
Standard
opening
degree
Opening degree is
corrected according
to discharge
temperature.
Positioning
Air conditioner ON
Air conditioner OFF
(thermostat off)
LEV opening degree
about 5 minutes <COOL, DRY>
about 15 minutes <HEAT>
(3) Control data
06
05
04
03
02
01
LEV opening degree
A(target discharge temperature)
B
C
D
E
F
30 50 70
Operational frequency of the compressor
90 110 130
(Hz)
A
50/45
B
53/52
C
60/59
D
66/68
E
70/76
F
70/76
(a) Reference value of target discharge temperature
(COOL/HEAT (MUZ)ºF)
54/49
58/58 64/66
70/74 70/82 70/85
MUZ-A09/12
MUZ-A15/17
MUY-A15/17
60/60
60/63 60/65
63/67
64/70 67/70
MUZ-A24
MUY-A24
Applied model
MUZ-A09/12/15/17/24
MUY-A15/17/24
OBT16--1.qxp 06.3.29 11:20 AM Page 18