29
OPERATING PROCEDURE PHOTOS
Photo 4
Photo 6
Vane motors
4. Removing the vane motor
(1) Remove the front panel. (Refer to 1.)
(2) Remove the electrical cover. (Refer to 2.)
(3) Remove the lead wire of vane motor.(Refer to 3.)
(4) Remove the R.L. holder.
(5) Pull out the drain hose from the nozzle assembly and
remove the nozzle assembly.
(6) Remove the screws of the vane motor and disconnect the
connector.
(7) Remove the vane motor.
Screws of the motor bed
5. Removing the line flow fan and the indoor fan motor
(1) Remove the front panel. (Refer to 1.)
(2) Remove the electrical box. (Refer to 3.)
(3) Remove the drain hose from the nozzle assembly and
remove the nozzle assembly.
(4) Remove the water cut.
(5) Slide the hole cover and remove the hole cover.
(6) Remove the hexagon socket set screw from the line flow
fan.
(7) Remove the screws fixing the motor bed and remove the
fan motor. (Be careful not to drop the fan motor because it
is heavy.)
(8) Remove the screws fixing the left side of the heat
exchanger.
(9) Lift the left side of the heat exchanger.
(
10
) Remove the line flow fan.
Screws fixing
the left side
of the heat
exchanger
Screws
of the
vane
motor
Screws of the
vane motor
Vane motor
Photo 5
Photo 7
Photo 8
Hole
cover
Water cut
OB450B-1.qxp 07.5.14 4:14 PM Page 29