Master Lock 70000 BTU/Hr Electric Heater User Manual


 
5
101585
UNPACKING
1. Remove all packing items applied to heater for shipment.
2. Remove all items from carton.
3. Check items for any shipping damage. If heater is damaged, promptly inform
dealer where you bought heater.
ASSEMBLY
(For 100,000 and 150,000
BTU/Hr Models Only)
These models are furnished with wheels and handles. Wheels, handles, and the
mounting hardware are found in the shipping carton.
Tools Needed
Medium Phillips Screwdriver
3/8" Open or Adjustable Wrench
Hammer
1. Slide axle through wheel support frame. Install wheels on axle.
IMPORTANT:
When installing wheels, point extended hub of wheels toward
wheel support frame (see Figure 4).
2. Place cap nuts on axle ends. Gently tap with hammer to secure.
3. Place heater on wheel support frame. Make sure air inlet end (rear) of heater is
over wheels. Line up holes on fuel tank ange with holes on wheel support
frame.
4. Place front handle and rear handle on top of fuel tank ange. Insert screws
through handles, fuel tank ange, and wheel support frame. Attach nut nger
tight after each screw is inserted.
5. After all screws are inserted, tighten nuts rmly.
Figure 4 - Wheel and Handle Assembly,100/150,000 BTU/Hr Models Only
Wheel
Support
Frame
Wheel
Cap Nut
Axle
Extended
Hub
Hot Air
Outlet
Fuel
Tank
Flange
Screw
Front
Handle
Rear
Handle
Air
Inlet
Nut