Hot Water Generator pump sizing
The SYNC has two (2) heat exchanger modules that require two (2) individual pumps for proper installation in the boiler loop
and an additional two (2) pumps for the Hot Water Generator loop.
Hot Water Pump Head Loss = Ft. of Head for Module 1 (at required flow) + Ft. of Head for the Hot Water Generator (at 2 X the
flow of Module 1)
Example:
Boiler: SB1500
A ΔT of 30° requires a flow through each module of 51 GPM. The module head loss is 18 ft. of head (see Table 5A).
Coupled with a Lochinvar Hot Water Generator with a 8-42 (diameter-length) tube bundle the calculated pressure drop is
1.2 Ft. of Head at 102 GPM.
Hot Water Pump Head Loss = 18 Ft/Hd (51 GPM) + 1.2 Ft/Hd (102 GPM) = 19.2 Ft/Hd
A pump will need to be selected to flow 51 GPM with a head loss of 19.2 Ft/Hd.
Figure 5-2 Boiler Schematic
MODULE 1
HOT WATER PUMP
MODULE 2
HOT WATER PUMP
MODULE 2
BOILER PUMP
MODULE 1
BOILER PUMP
102 GPM
51 GPM
102 GPM
51 GPM
T
O SYSTEM
FROM SYSTEM
HOT WATER
GENERATOR
AIR COVER
OK
TO BOILER
INLETS
FROM SYSTEM
NO
TO BOILER
INLETS
FROM SYSTEM