Lightolier IS:1104IC Indoor Furnishings User Manual


 
READ AND UNDERSTAND THESE INSTRUCTIONS BEFORE INSTALLING FIXTURE
This fixture is intended for installation in accordance with the National Electrical Code and local regulations.
To assure full compliance with local codes and regulations, check with your local electrical inspector before
installation. To prevent electrical shock, turn off electricity at fuse box before proceeding.
Retain these instructions for maintenance reference.
LIGHTOLIER a GENLYTE company.
631 Airport Road, Fall River, MA 02720
INSTRUCTION SHEET NO.
IS:1104IC
E1204 Page 2 of 2
2. WIRE-IN (Fig. B)
Open hinged J-BOX COVER fully to its locked position (lift slightly
to unlock).
Open hinged KNOCK OUT to allow NON-METALLIC CABLE
to enter JUNCTION BOX. Push CABLE through CLAMP.
NOTE: Wiring and connections must not be placed in JUNCTION
BOX in a manner which will interfere with the CLAMPS
action to provide strain relief.
Wire to SUPPLY LEADS. WHITE FIXTURE LEAD to NEUTRAL SUP-
PLY LEAD. BLACK FIXTURE LEAD to HOT (120V) SUPPLY LEAD.
BARE FIXTURE WIRE to SUPPLY GROUND. Use wirenuts (local
hardware item). Place all electrical connections in the
J-BOX and close the J-BOX COVER.
3. SWING-UP (Fig. C)
Extend MOUNTING BAR to reach opposite joist and fasten in
place. Adjust to desired position along MOUNTING BAR and lock
in place.
4. CLOSE-IN (Fig. D)
Install plasterboard or other dry type ceiling. Hole in board
can be cut either on the floor or after the board is secured to the
ceiling using HOUSING opening as cutting guide. HOUSING is
secured by 3 screws which allow adjustment for variable
ceiling thicknesses.
5. AIRSEAL
®
INSTALLATION (optional)
Option 1: Install LAS56 Flange Gasket Kit (available separately).
Option 2: Install a bead of silicone caulking compound between
the ceiling opening and edge of HOUSING. Housings are tested in
accordance with ASTM E 283 (max 2 cfm @ 75 pa) and comply
with WSEC & MEC when installed as instructed.
NOTE: If factory installed tape or knockouts are removed from
vertical adjustment slots in housing wall LAS56 Flange Gasket
Kit must be used (available separately).
6. SNAP-ON (Fig. F)
Important - Insert SOCKET CUP in neck
of REFLECTOR making sure SPRING TABS
fully engage into SLOTS in REFLECTOR.
7. PUSH-UP (Fig. E)
Push REFLECTOR TRIM straight up until
it is tight against ceiling.
To remove TRIM:
Turn off power to fixture
Remove lamp
Squeeze REFLECTOR SPRING from inside until the
TRIM disengages.
To retrieve SOCKET CUP, pull on one of the SOCKET
SPRING LEGS to disengage.
SEE SEPARATE
REFLECTOR TRIM
INSTRUCTION
SHEETS
U.S. AND FOREIGN PATENTS PENDING
}
SQUEEZE CLIP
Squeeze to adjust, release to lock
MOUNTING BAR
DEFORM MATERIAL HERE
FOR ADDITIONAL LOCK
HINGED KNOCK OUT
J-BOX COVER
NON-METALLIC
SHEATHED CABLE
(12 OR 14 GAUGE ONLY)
CABLE CLAMP
JUNCTION BOX
SOCKET CUP
REFLECTOR SPRING
FOR TIGHT SPACES:
MOUNTING BAR CHANNELS
can be shortened and used as
nailing legs in tight spaces.
Simply remove INNER BAR
from holed CHANNEL, bend CHANNEL at appropriate point
and use extra screw to secure it to the joist. (Fig. D)