12 Room Air Conditioner
Installation
Installation Kits Contents
Suggested Tool Requirements
PREPARATION OF CHASSIS
1. Remove the screws which fasten the cabinet
at both sides and at the back.
2. Slide the unit from the cabinet by gripping the
base pan handle and pulling forward while
bracing the cabinet.
3. Remove EPS Material.
4. Cut the window sash seal to the proper
length. Peel off the backing and attach the
foam-pe to the underside of the window
sash.
5. Remove the backing from the top upper
guide Foam PE and attach it to the bottom
of the upper guide
6. Attach the upper guide onto the top of the
cabinet with 3 type A screws.
7. Insert the frame guides
into the bottom of
the cabinet.
8. Insert the Frame Curtain into the upper
guide and frame guides .
9. Fasten the curtains to the unit with 4 Type A
screws.
SCREWDRIVER(+, -), RULER, KNIFE, HAMMER, PENCIL, LEVEL
NO. NAME OF PARTS Q'TY
1 FRAME CURTAIN 2
2 SILL SUPPORT 2
3 BOLT 2
4 NUT 2
5 SCREW(TYPE A) 16
6 SCREW(TYPE B) 3
7 SCREW(TYPE C) 5
8 FOAM-STRIP 1
9 FOAM-PE 1
10 FOAM-PE 1
11 FRAME GUIDE 2
12
WINDOW LOCKING BRACKET
1
1
2 3 4
8 9
10
765
12
11
9
11
5
5
5
12
12
Shipping screws
EPS Material
Upper guide
Upper guide
(Type A)
(Type A)