Lennox Hearth S160 Stove User Manual


 
14
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.
1. Check that all chimney pipe joints are securely fastened.
2. Check that the heater is securely fastened to the floor (if ap-
plicable).
3. Make sure the intake vent has clear access to outside air (if ap-
plicable).
4. Make sure the outside air vent has been sealed properly to keep
rodents out (if applicable).
5. Be sure all roof flashings are watertight.
6. Be sure the stove is properly grounded (if applicable).
FOR YOUR OWN PROTECTION AND INSURANCE PURPOSES,
HAVE YOUR CHIMNEY AND CONNECTOR PIPE INSTALLATION
INSPECTED BY YOUR LOCAL BUILDING CODE AUTHORITY OR
FIRE MARSHAL BEFORE STARTING A FIRE IN YOUR STOVE.
NOTIFY YOUR INSURANCE COMPANY.
CAUTION: Wear gloves during brick installation in case of
sharp edges inside the stove.
Note: Installation of the baffle boards and baffle blanket is easier when
you can still access the flue outlet, (before connecting the flue vent). Be
sure the baffle blanket is placed flat on the baffle boards so as not
to block exhaust flow to the flue. Use a ruler or a piece of kindling to
reach over the baffle blanket to be sure it is completely flat on top of the
baffle boards.
Measure bricks before installing, as per list of dimensions on next page,
to be sure the correct bricks are installed in the correct location.
1. Install bricks #1-18 in the numbered sequence shown in Figure 14
on Page 15.
2. Next, you will install the rear baffle boards which are the smaller two
of the four baffle boards. The boards will be installed with the 3-9/16”
dimension from the front to the rear of the firebox. These boards
will be placed on the top side of the rear baffle just to the rear of the
middle secondary tube, you will push the baffle boards towards the
rear of the firebox until they fall in place at the rear side of the middle
secondary tube. You will place one board to the far left side of the
firebox and one board to far right side of the firebox. Confirm that
both boards are laying flat on the rear baffle and that they are not
overlapping each other.
POST INSTALLATION CHECKS
BRICK INSTALLATION