2. Handle Valve Installation
NOTE: The valve body marked ″Cold″ (with blue lettered tape
attached to the tube) should be installed to the right of the faucet.
Insert the valve bodies into the proper mounting holes.
Apply a bead of plumbers putty or other sealant to the underside
of the escutcheons according to the putty manufacturer’s
instructions.
Install a washer and a nut onto the underside of each valve body.
Rotate each valve body until the copper tubing faces towards the
outside of the lavatory.
While holding the valve bodies in place, securely tighten the
locknuts with a wrench. Do not overtighten.
Remove any excess putty or sealant.
Handle
Escutcheon
Apply Plumbers
Putty.
Valve
Body
Copper
Tube
Nut
Washer
1010441-2-B 4 Kohler Co.