Jacuzzi BM43000 Plumbing Product User Manual


 
2
BEFORE YOU BEGIN
TOOLS AND MATERIALS
You can determine which tools and materials are necessary by reading the complete
installation instructions and examining the job you have to do.
These are normally needed:
utility knife basin or pail and sponge
flat blade screwdriver hammer and nails
drill chisel
saber saw or keyhole saw square
emery cloth cardboard, newspapers or a dropcloth
The following materials are optional, in case existing materials are unusable:
Two (2) shut-off valves with 1/2" I.P.S. outlet, (check house piping to determine
valve inlet dimension.),
1/2" I.P.S. hot and cold water supply tubes with compression nut and ferrule,
drain tail pipe (two for double bowl sinks) and trap,
additional drain pipe as required,
2" x 4" board
Hacksaw
! Observe all local plumbing and building codes.
! Carefully inspect the new lavatory for damage.
! If the existing lavatory does not have supply shut-off valves, you will install them
before installing the new lavatory.
! Rough-in information is included with your lavatory. The rough-in information
shown will be helpful in placing the lavatory, water supply piping, shut-off valves
and drain in their proper positions.
CAUTION: Your new lavatory is finished to an attractive high gloss. It may also be heavy
and difficult to lift. To protect the finish and avoid possible damage before and after
installation, please handle your lavatory with care. Place the lavatory on a thick bed of
newspapers when working on it before installation.
Pipe Wrench
(12")
Level
Safety Glasses
Basin Wrench
Tape Measure
Tubing Cutter
READ AND FOLLOW ALL INSTRUCTIONS
Adjustable Wrench
(10")