Hubbell Electric Heater Company V20 Water Heater User Manual


 
9
Building Management System (BMS)
A Building Management System control package may be supplied for remote operation and alarm
capabilities.
Pump Interlock Terminal Block
An optional pump interlock terminal block may be installed to prevent energizing when the pump is not
running.
Silicon Control Rectifier
A silicon control rectifier (SCR) “zero fired” power controller for 0-100% proportional control of
heaters may be supplied.
Digital Display
A 1/16 DIN electronic temperature control package may
be installed. A separate manufacturer’s operating
manual will be supplied with the unit.
Optional Connections
Flanged inlet and outlet connections (150#)
Threaded inlet and outlet connections (1 ½”, 2” MNPT)
Sanitary Connections
Suspension Straps
For under counter, off the floor operation an optional suspension strap may be supplied in place of the
standard support legs.
Special Customized Features
Please reference drawing for details.