Hearth and Home Technologies CASTILE-PMH1 Stove User Manual


 
R
September 1, 2008
250-6422E
Page 33
Castile Pellet Stove
E. Igniter Replacement
F. Baffle Removal
a. Turn down thermostat, let the appliance completely
cool and then unplug appliance before servicing.
b. Open the ash door and remove the ash pan. Remove
the left side panel by loosening 2 screws (do not
remove) and pull side panel away.
c. The wire leads to the igniter are connected to the
wire harness (black wires) with 1/4 inch male / female
spade connectors. Disconnect the spade connections.
Loosen the thumb screw and slide igniter out.
c. Install new igniter into the chamber and tighten the
thumb screw.
d. Re-connect the wires to the 2 leads with the spade
connectors. Double check that the igniter wires are
clear of any movement, i.e. ash pan, firepot cleaning
rod, cleaning slide plates, etc.
f. Re-install the ash pan, close the ash removal door.
a. Allow appliance to cool completely.
b. Open doors and locate the latch. It is located between
the front edge of the top baffle and the inside of the fire-
box centered from side to side. The latch pivots up and
down.
c. Push the latch up with your finger while sliding the top
baffle forward and down. Figure 33.2.
d. To re-install the top baffle, align the hooks on the baffle
with the slots in the baffle hangers, push up and slide
back. Figure 33.3.
e. Make sure the latch drops back into position, bypass-
ing the first notch and catching the front edge of the top
baffle with the second small notch.
hm Sre
gniter
gniter
ra ket
Figure 33.1
Figure 33.2
Figure 33.3
NOTE: There is a latch on the appliance to keep the
top baffle from coming out during shipment or when
the heat exchanger scraper rods are pulled.
Hook on
Second Notch
Latch
Push Up Latch
Slide Top Baffle
Forward and Down
Face of Stove
Latch
Top Baffle