Harbor Freight Tools 91793 Heat Pump User Manual


 
SKU 91793 Page 4
Unpacking
When unpacking, check to make sure the following parts are included.
High Pressure Cast Iron Grease Pump
22 lb. Capacity Steel Bucket
Spring Loaded Steel Follower Plate
2 Meter High Pressure Rubber hose
Fitted Steel Extension and Zerk Coupler
If any parts are missing or broken, please call Harbor Freight Tools at the number
on the cover of this manual.
Assembly
1. Remove all packaging material from the pump and its parts.
2. Thread the Lever Handle (1) into the Handle Bracket (2), and turn it clockwise
until it is tight.
3. Open all 4 Cover Clamps (17), by lifting their handles up from the bottom, and
letting their clamps fall away from the Drum Cover (5). Remove the complete
Drum Cover (5) and Pump (10) assembly, set these aside.
4. Wipe out the Grease Drum (9) with a clean, dry rag to remove any
contaminants that may be present.
5. Fill the Grease Drum (9) with up to 22 lbs. of bulk grease. Be sure to leave at
least 1” from the top of the Grease Drum (9) unfilled, to make room for the
pump and its components.
NOTE: Never put contaminated grease into the Grease Drum (9) as contaminants
may damage the pump or the mechanism the grease is eventually pumped into. If
grease is spilled onto the floor while filling, that grease should be discarded.
6. Place the Drum Cover (5) and Pump (10) assembly back onto the Grease
Drum (9), with the Follower Plate (8) resting on the grease.
7. Push the Drum Cover (5) down onto the top of the Grease Drum (9). This will
compress the Compression Spring (7), and will expel any air that might be
trapped in the grease.
8. Reattach all four Cover Clamps (17), by positioning the clamp over the edge
of the Drum Cover (5), and pressing the lever of the Cover Clamps (17) down
to lock them closed. Your Grease Pump is now ready for operation.