11
Fig.2
Rubber
stopper
Condenser
Fig.1
Thickness of the wall
Iron support
A B
A
B
1. Cut a wall hole or a window hole (see Fig.1).
2. Fix the iron support in a firm place with
expansible screws.
3. Take the air conditioner and its attach-
ments out from the packing carton.
4. Let the rear of the air conditioner raise
slightly, the drain hole on the bottom can
be seen.
Clog it with a black rubber stopper attached
to the air conditioner (see Fig.2).
5. Insert the drain connecting pipe (with a seal
circle) attached to the air conditioner into
the vertical drain hole on the bottom
(see Fig. 3).
6. The condensate needing to be led to the
designated place, buy a soft plastic pipe
with internal diameter of 16mm to connect
the drain connecting pipe and tied it tightly.
7. All attachments being fixed, put the air
conditioner on the iron support. If there
is a drain hose, lead it to a required place
(see Fig.5).
The installation of air conditioner(only for reference)
Fig.4
Seal circle
Drain hose
Drain connecting
pipe
Fig.3
Installation instruction
530350
HW-09CV03
HW-12CV03