Haier HBU-18HF03 Air Conditioner User Manual


 
17
(2) Ceiling height
Indoor unit can be installed on ceiling of 2.5-3m
in height. (Refer to Field setting and Installation
Manual of ornament panel.)
(3) Install suspending bolt. Check if the installation
place is strong enough to hold weight. Take necessary
measures in case it is not safe. (Distance between holes
are marked on paper pattern. Refer to paper pattern
for place which need be reinforced)
(1) Installation place shall meet the following and agreed by customers:
Place where proper air flow can be ensured.
No block to air flow.
Water drainage is smooth.
Place strong enough to support unit .
Place where inclination is not evident on ceiling.
Enough space for maintenance.
Indoor and outdoor unit piping length is within limit. (Refer to Installation Manual for outdoor
unit.)
Indoor and outdoor unit, power cable, inter unit cable are at least 1 m away fromT.V. radio.
This is helpful to avoid picture disturbance and noise. (Even if 1 m is kept, noise can still appear
if radio wave is strong)
<Don't discard any accessories until completed>
Determine the way to carry unit to installation place.
Don't remove packing until unit reaches installation place.
If unpacking is unavoidable, protect unit properly.
1
2
Before installation
Selection of installation place
Installation space
Air inlet
Air outlet
2500 Over
Air outlet
1500 Over
1500 Over
310
Overlap between ceiling and
ornament panel shall be 25mm
Suspending bolts
Ceiling
Ornament panel
150mm
320mm
60mm
3
Preparation for the installation
(1) Position of ceiling opening between unit and suspending bolt.
Installation Procedure
Distance between
suspending bolts 535mm
Indoor unit 570mm
Ceiling opening 650mm
Ornament panel 700mm
Indoor unit 570mm
Ceiling opening 650mm
Ornament panel 700mm