Haier AD242AHBEA Air Conditioner User Manual


 
14
(1) The position relation among hoisting screw (unit: mm)
(3) Hanger bolts installation
Use care of the piping direction when the unit is installed.
Hanging bolt M10
Hole-in anchor
Hole-in plug
Insert
Concrete
360
890
250
794
600
750
Down side
Up side
360
1270
250
794
853853
1103
Down side
Up side
(2) If necessary, cut the opening installation and checking needed on the ceiling. (If has ceiling)
Before installation, finish the preparation work of all the pipes (refrigerant, drainage) and wire
(wire controller connection wire, indoor and outdoor unit connection wire) of indoor unit, so that
after installation, they can be immediately connected with outdoor unit.
Cut the opening on the ceiling. Maybe it needs to strengthen the ceiling to keep the ceiling even
and flat and prevent the ceiling from vibration. For details, please consult to the builder.
(Use M10 screw bolt)
In order to bear the weight of the unit, for existed
ceiling, using foundation screw bolt, for new ceiling,
using burying embedded screw bolt, burying screw
bolt or spot supplied other parts.
Before going on installation, adjust the gaps with ceiling.
3. Preparation before installation
AD242AHBEA
AD28NAHBEA
AD36NAHBEA
AD42NAHBEA
AD52NAHBEA
Installation Manual For Indoor Unit