3. INSTALL THE AIR CONDITIONER IN THE WINDOW
a. Carefully lift the air conditioner and slide it into the
open window. Make sure the bottom guide of the air
conditioner drops into the notches of the
L bracket. See Figure. 27.
IMPORTANT :
When the air conditioner drops into the L bracket, the air
conditioner will be centered in window opening as shown in
Figure. 28.
b. While steadying the air conditioner, carefully bring the
window sash down behind the upper guide of the air
conditioner, as shown in Figure. 29.
4. SECURE THE GUIDE PANELS
Extend the guide panels (TYPE F) to fill the window
opening using 4 screws (TYPE B) to secure them, as
shown in Figure. 30.
5. INSTALL THE SASH SEAL AND SASH LOCK
a. Cut the sash seal (TYPE E) to the window width. Stuff
the sash seal between the glass and the window to
prevent air and insects from getting into the room, as
shown in Figure. 30.
b. Fasten the L bracket using a (TYPE A) screw, as
shown in Figure. 30.
6. Window installation of room air conditioner is now
completed. See ELECTRICAL DATA for attaching
power cord to electrical outlet.
3.2.4 How to Secure the Drain pipe
In humid weather, excess water may cause the BASE
PAN to overflow. To drain the water, remove the DRAIN
CAP and secure the DRAIN PIPE to the rear hole of the
BASE PAN. (Figure. 31)
15
OUTSIDE
INSIDE
L
BRACKET
OUTER SILL
SHORT SIDE
INNER SILL
TYPE A
8"
8"
CENTER LINE
CENTER LINE
SEAL
WINDOW FRAME
BOTTOM
GUIDE
ABOUT
1/4"
L
BRACKET
UPPER GUIDE
DRAIN PIPE
DRAIN CAP
hang push
TYPE B
SASH SEAL
(TYPE E)
L BRACKET
TYPE A
Figure 27
Figure 28
Figure 29
Figure 30
Figure 31