![](http://pdfasset.owneriq.net/8/39/83961bc1-b21e-490e-ac67-c494bd0573e7/83961bc1-b21e-490e-ac67-c494bd0573e7-bg2.png)
Optional Brackets
GIANNI INDUSTRIES, INC.
The products are manufactured under an ISO
9001 QC 080000 Certified Quality
Management Program environment back its
product quality, performance and commitment
tocustomersatisfaction.
&
GS-200 MINI SHEAR LOCK
The unit may also be fitted semi-flush or sureface
installation with the use of the SMB-200 and UBK-182
Brackets. The magnet should be fitted to the door transom and
the housing holding the armature on to the door. It is vital that
a minimum gap of 2mm exists between the magnet and the
armature, to allowcorrect operation.
SMB-200 Bracket
35
48
182
UBK-182 Bracket
14
48
182
M6x45Screw
M6x45
Screw
BlindNut
BlindNut
Magnet
Assembly
Armature
Assembly
Metal Door
Header
Semi- Flush Installation
BlindNut
M6x45
Screw
MagnetAssembly
SurfaceMount
ArmatureAssembly
Metal Door
Header
Miniclearance
2mmofgap
Surface Installation
Magnet
Assembly
Armature
Assembly
Miniclearance
=7mm
Installation on Frameless Glass Door
GS-200 using 2pcs of the
SMB-200 Bracket and 2pcs of
the UBK-182 mounting
brackets.(The thickness of
glass are 14mm maximum.)
GS-200VGL
Copyright 2008Gianniindustries,inc.Allrightsreserved.
DM-CA-GS-200 Ver.C Publishedon2008.05.14
No.13, Zhong Sing Road,Tu-Cheng Industrial Zone,
Tu-ChengCity, Taipei, Taiwan 23678
Tel:886-2 2267 7986 /Fax: 886-2 2267 9876
E-Mail:info@gianni.com.tw
Website:gianni.tw