GE AVE18 Air Conditioner User Manual


 
12
Customer Service Troubleshooting Tips
Operating Instructions
Safety Instructions
Installation Instructions
Customer Service Troubleshooting Tips
Installation Instructions
Safety Instructions
Operating Instructions
Customer Service Troubleshooting Tips
Installation Instructions
Safety Instructions
Operating Instructions
Window Installation Instructions
Install the Window Filler Panels and Locking Bracket
Insert the cut edge of the filler panel into the
case side seal groove.
Leave a small space at the bottom
of the case side seal groove.
Push the filler panel backward toward the
window frame until it clears the window stool.
Slide the filler panel out from the air
conditioner case. Make sure it contacts the
window molding.
Slide the filler panel into place.
Use upholstery tacks to attach the filler panel
to the face of the window molding through the
holes provided.
Pull the sliders out until they contact the
face of the window molding.
Pull the window down tightly and lock it in
place with 5/8screws.
Attach through the holes on
each side of the window sash
Attach the window locking bracket with
a 5/8screw.
G
F
E
D
C
B
A
7
Install the Window Gasket and Replace the Air Conditioner
Cut the foam top window gasket to the window
width. Stuff the foam between the glass and the
window to prevent air and insects from getting
into the room.
Slide the air conditioner into the case and
replace the front grille. Install the two
ground/anti-theft screws removed at the
beginning of the installation.
Make sure the unit is
OFF
before inserting
cord plug into the outlet.
Check all seals and plug any remaining air gaps
with a suitable weatherproof caulk.
D
C
BA
8
Case
Case
Attach
Window
molding