4
920-198-10
STEP 1. Remove unit from carton and inspect.
STEP 2. Remove accessories from drain bucket.
STEP 3. Install Roll Casters (D25D models only) per installation
instructions below.
STEP 4. Set up unit in position with adequate clearance. Installation
of unit is complete.
Roll Caster Installation (D25D Models only)
STEP 1. Locate Roll Casters removed during STEP 2 above.
STEP 2. Lay unit on its side for ease of installation.
STEP 3. Insert Roll Casters in slots as shown (See Figure 3) until they
click into place.
Figure 3
FRD031
ROLL CASTER
STEP 4. Set the unit upright. Roll Caster installation is complete.
STEP 5. Allow unit to sit upright 1 hour before operating.
OPERATION INSTRUCTIONS
WARNING
Electrical Hazards
Do not fold power cord as shown at left.
Do not use multiple sockets as shown at
left.
Do not have wet hands when connecting
the power plug.
Do not pull the power cord to avoid a
broken cord, which can lead to danger.
Make sure the plug is placed fully and
firmly into the receptacle.
Make sure the plug is clean.
After turning the unit off please take plug
out of the receptacle.
Follow the steps below for unpacking and set up your unit.
Allow 8 inches of space on all sides of the unit.
Figure 4
FRD032
8’’
8’’
8’’
8’’
INSTALLATION INSTRUCTIONS
www.sylvane.com 1-800-934-9194