Installation
MODEL 1200 BRICK PLACEMENT:
COMPLETE THE STOVE AND SMOKE PIPE INSTALLATION BEFORE PLACING THESE BRICKS.
1. Place the three (3) full size bricks along each side of the rebox and one (1) full size brick on either
side of the back of the rebox.
2. To place the oor bricks, lay the two (2) partial bricks along the back of the oor. Then on the left, lay
two (2) full size bricks and on the right, lay a full size brick in the center and the half brick in the front
(for the ash dump). The spaces between the bricks will soon ll with ashes.
When replacing bricks, use only pumas type re bricks.
TOTAL BRICKS:
11 - Full size bricks 9” long x 4.5” wide x 1.25” thick
(22.9 cm long x 11.4 cm wide x 3.2 cm thick)
2 - Partial bricks 9” long x 3” wide x 1.25” thick
(22.9 cm long x 7.6 cm wide 3.2 cm thick)
1 - Half brick 4.5 “ long x 4.5” wide x 1.25” thick
(11.43 cm long x 11.43 cm wide x 3.175 cm thick)
Figure 34: Brick Placement for 1200 shown with Secondary Air Channel and Tubes.