England's Stove Works 55-SHP22E Stove User Manual


 
touch pad. This will start the upper auger, bottom auger and exhaust
blower. The room air blower will start later as the stove reaches the pre-set blower
temperature (see “Control Board” section for further explanation).
5. Check to be sure both augers and the exhaust blower are operating before connecting the
unit to the flue system. Be sure to “dry run” your unit for 20 minutes
before connecting it to the flue (it should stop automatically after 20 minutes).
Proper Impingement (Baffle) Plate Placement
in Pellet Stove Firebox
Occasionally in shipping, the impingement (baffle) plate may shift out of its proper
position. If this is the case with your stove, follow these instructions to return the plate
to its proper position.
1. Remove the plate from the stove, holding the plate by its tab handle, with the
cutout notch facing upwards.
2. Turn the notched end into the doorway (as shown above), and lift the plate up to
allow the bottom of the plate to fit in the doorway.
3. Let the bottom of the plate rest on the firebox, and then push the bottom of the
plate flush against the back wall of the firebox. At this point, the plate will lean
forward (toward the front of the stove) slightly, and will come in contact with the
front of the stove above the door.
4. Finally, center the plate on the firebox, so that it will be centered above the fire
when the stove is in operation.
Customer Service: (800) 245-6489 www.englandsstoveworks.com