3
INTRODUCTION
Your new water boiler is designed to give years of trouble free service provided
that the instructions contained in this manual are followed carefully.
Your new boiler is energy efficient, simple to operate and easy to service.
It is recommended that the installation is carried out by a properly qualified fitter.
CHECK LIST
Before starting installation, check that you have the following parts:
1. Boiler Unit
2. Case
3. Mounting Template
4. Fitting Kit
5. Tap Kit (WB5E Only)
INSTALLATION
POSITIONING THE UNIT
The heater should be positioned in a convenient place on a wall that is capable
of supporting it safely. Use the mounting template and fitting kit provided.
Position the boiler so that the tap is about 400mm above a draining board.
Leave sufficient space around the unit to enable access for servicing, paying
particular attention to the position of the top centre fixing screw that holds the
cover in place.
Screw in the top two screws leaving about 6mm protruding and hang the
machine using the keyhole slots provided. Once the machine is positioned,
tighten the top screws and insert the bottom screw.
ELECTRICAL CONNECTION ALL MACHINES
Supply – 220/240V 50Hz – 3kW. The circuit should be protected by its own
13amp double pole connection unit with flex outlet to BS5733, alternatively the
circuit should have means of disconnection incorporated in fixed wiring, having
a contact separation of at least 3mm in all poles. Minimum cable size is 1.5mm2.
The use of an ELCB is recommended.
Electrical installation should conform to current I.E.E. wiring regulations.
When using fixed wiring, the bare section of earth wire must be sleeved to
within 8mm of the end.
Only a qualified electrician should carry out this work.