Desa (V)G36R Indoor Fireplace User Manual


 
www.desatech.com
116010-01C 9
VENTING INSTALLATION
Continued


Determine the ashing to be used with the roof
opening chart. Slide ashing over pipe until base
is at against roof. Replace as many shingles as
needed to cover exposed area and ashing base.
Secure in position by nailing through shingles
(see Figure 13). DO NOT NAIL THROUGH
FLASHING CONE.
Nail Only
Outer
Perimeter
of Flashing
Storm
Collar
Flashing
Cone
Underlap
Shingles
at Bottom
Overlap
Shingles Top
and Sides Only
Figure 13 - Flashing Installation

When installing the ashing on a metal roof, it is
required that putty tape be used between the ash-
ing and the roof. The ashing must be secured to
the roof using #8 x 3/4" screws and then sealed
with roof coating to prevent leakage through the
screw holes. A roof coating must also be applied
around the perimeter of the ashing to provide a
proper seal.

Place storm collar over pipe and slide down until
it is snug against the open edge of the ashing (see
Figure 14). Apply waterproof caulk around the
perimeter of the collar to provide a proper seal.
Figure 14 - Storm Collar
Chimney
Pipe
Waterproof
Caulk
Storm
Collar
Flashing
Terminations/Spark Arrestor
The replace system must be terminated with the
listed round top or chase terminations. In any case,
refer to the installation instructions supplied with
the termination.
-
-
low the installation instructions
provided with the termination
being used.
Secure
Termination
to Outer
Pipe with 3
Screws
RTL-10D
Level of
Flue Gas
Outlet
Stainless
Inner Flue
Pipe
Waterproof
Caulking
Storm
Collar
Flashing
Underlap
Shingles
Figure 15 - Termination
Overlap
Shingles (Top
and Sides of
Flashing Base)

Instructions for chase installations are included
with the chase style termination chosen. In a
multiple chase installation, be sure to provide
adequate distance between terminations to prevent
smoke spillage from one termination to another.
We suggest that terminations be separated at least
24" center to center and stacked at a vertical height
difference of 18" (see Figure 16, page 10).
Note: If a decorative shroud is to be installed,
contact the manufacturer for specications.