Desa VDDVF36STN/STP Indoor Fireplace User Manual


 
106918-01B
For more information, visit www.desatech.com
For more information, visit www.desatech.com
6
PRE-INSTALLATION
PREPARATION
Continued
Figure 8 - Rough Opening for Installing Peninsula Fireplace on
Platform
* As required by design as long as ceiling clearance is maintained.
39
3
/
4
"
(101cm)
Min.
40
1
/
2
"
(102.9cm
)
23
5
/
8
"
(60cm
)
*
Platform Must Be
Solid, Flat, and
Fully Supported
Figure 9 - Rough Opening for Installing See-thru Fireplace
39
3
/
4
"
(101cm)
Min.
43
1
/4"
(109.8cm
)
23
5
/
8
"
(60cm
)
Figure 10 - Hole Locations For Gas Line and Electric Wires for
Peninsula and See-thru Fireplaces
3" (7.6cm)
1" (2.5cm)
Dia. Hole
3"
(7.6cm)
2" (5.1cm)
Dia. Hole
1"
(2.5cm)
2"
(5.1cm)
Figure 11 - Rough Opening for Installing Exterior Vent Terminal
Height
Depends On
Installation
10"
(25.4cm)
Square Min.
Figure 12 - Vent Opening Height
Vertical Height
Depends on
Installation
26
3
/
8
"
(67cm)
Horizontal
Length Depends
on Installation
90
o
Elbow
45
o
Elbow
Refer to Pages 10 through 16
for Horizontal and Vertical
Installation Details
PRE-INSTALLATION PREPARATION
Framing (Cont.)
The gas supply line may be connected through the side framing or
alternately through the lower sub-flooring or a platform base if
provided (see Figures 10 and 11). Depending on the installation,
refer to the appropriate illustration.