Desa S42RH Indoor Fireplace User Manual


 
www.desatech.com
111099-01D 9
VENTING INSTALLATION
Continued
14
3
/
8
" Min.
(365 mm)
30" Min.
(762 mm)
1" Min.
(25 mm)
1" Min.
(25 mm)
1" Min.
(25 mm)
Opening "A"
Pitch Slope Opening "A"



Flat 15" V6F-8DM
0-6/12 26.6° 16
1
/
8
" V6F-8DM
6/12-
12/12
45.0° 20
3
/
8
" V12F-8DM


Determine the ashing to be used with the roof
opening chart. Slide ashing over pipe until base
is at against roof. Replace as many shingles as
needed to cover exposed area and ashing base.
Secure in position by nailing through shingles
(see Figure 13). DO NOT NAIL THROUGH
FLASHING CONE.

When installing the ashing on a metal roof, it is
required that putty tape be used between the ashing
and the roof. The ashing must be secured to the roof
using #8 x 3/4" screws and then sealed with roof coat-
ing to prevent leakage through the screw holes. A roof
coating must also be applied around the perimeter of
the ashing to provide a proper seal.
Figure 12 - Roof Opening Measurements
Nail Only
Outer
Perimeter
of Flashing
Storm Collar
Flashing
Cone
Underlap Shingles
at Bottom
Overlap
Shingles Top
and Sides Only
Figure 13 - Flashing Installation
Storm Collar Installation (SC1 or SC2)
Place storm collar over pipe and slide down until
it is snug against the open edge of the ashing (see
Figure 14). Use SC1 for all round terminations and
SC2 for all terminations with slip sections. Apply
waterproof caulk around the perimeter of the collar
to provide a proper seal.
Figure 14 - Storm Collar
Chimney
Pipe
Waterproof
Caulk
Storm
Collar
Flashing
Terminations/Spark Arrestor
The replace system must be terminated with the
listed round top or chase terminations. In any case,
refer to the installation instructions supplied with
the termination. The termination approved for this
replace are the RT-8DM and RTL-8DM that can
be used for ashing or chase and ET-8DM, ETO-
8DM, ETL-8DM and ETLO-8DM for chase style
termination only. Figure 15 shows an RTL-8DM
round top termination.
-
-
low the installation instructions
provided with the termination
being used.
Attach Bracket
Tabs to
Outer Pipe
(3 Places)
Secure with
Screws
RTL-8D
Level of
Flue Gas
Outlet
Caulk
Collar
Flashing
Underlap
Shingles
Bottom Only
Figure 15 - Termination
Overlap
Shingles Top
and Sides