Desa 000 to 30 Water Heater User Manual


 
12
104434
VENT-FREE PROPANE/LP HEATER
Tee Joint
Reducer
Bushing to
1/8" NPT
1/8" NPT
Plug Tap
Test
Gauge
Connection *
Tee Joint
Pipe
Nipple
Cap
Sediment
Trap
Figure 21 - Gas Connection
* An CSA/AGA design-certified equipment shutoff valve with 1/8" NPT tap is an
acceptable alternative to test gauge connection. Purchase the optional CSA/AGA design-
certified equipment shutoff valve from your dealer. See Accessories, page 21.
Pressure
Regulator
3/8" NPT
Pipe Nipple
Ground
Union
Joint
Heater
Cabinet
3" Minimum
Note:
Burner bracket
not shown for clarity
Equipment
Shutoff
Valve *
From External
Regulator (11"
W.C. to 14"W.C.
Pressure)
CONNECTING TO GAS
SUPPLY
WARNING: A qualified service
person must connect heater to
gas supply. Follow all local codes.
CAUTION: Never connect
heater directly to the propane/LP
supply. This heater requires an ex-
ternal regulator (not supplied). In-
stall the external regulator between
the heater and propane/LP supply.
CAUTION: Use pipe joint seal-
ant that is resistant to liquid pe-
troleum (LP) gas.
The installer must supply an external regu-
lator. The external regulator will reduce
incoming gas pressure. You must reduce
incoming gas pressure to between 11 and 14
inches of water. If you do not reduce incom-
ing gas pressure, heater regulator damage
could occur. Install external regulator with
the vent pointing down as shown in Figure
20. Pointing the vent down protects it from
freezing rain or sleet.
We recommenc that you install a sediment
trap in supply line as shown in Figure 21.
Locate sediment trap where it is within
reach for cleaning. Install in piping system
between fuel supply and heater. Locate sedi-
ment trap where trapped matter is not likely
to freeze. A sediment trap traps moisture
and contaminants. This keeps them from
going into heater controls. If sediment trap
is not installed or is installed wrong, heater
may not run properly.
IMPORTANT:
Hold pressure regulator with
wrench when connecting it to gas piping
and/or fittings.
Propane/LP
Supply Tank
External
Regulator
Installation must include a equipment shutoff
valve, union, and plugged 1/8" NPT tap.
Locate NPT tap within reach for test gauge
hook up. NPT tap must be upstream from
heater (see Figure 21).
IMPORTANT:
Install an equipment shutoff
valve in an accessible location. The equip-
ment shutoff valve is for turning on or
shutting off the gas to the appliance.
Apply pipe joint sealant lightly to male
threads. This will prevent excess sealant
from going into pipe. Excess sealant in pipe
could result in clogged heater valves.
Figure 20 - External Regulator with Vent
Pointing Down
Vent Pointing Down
INSTALLATION
Continued
CAUTION: Use only new,
black iron or steel pipe. Inter-
nally-tinned copper tubing may
be used in certain areas. Check
your local codes. Use pipe of 1/2"
or greater diameter to allow
proper gas volume to heater. If
pipe is too small, undue loss of
pressure will occur.
WARNING: This appliance re-
quires a 3/8" NPT (National Pipe
Thread) inlet connection to the
pressure regulator.