2
R18222 & R18222-WS Installation
Remove the bonnet nut, cartridge and
plasterguard (1), plus, the screen, test
cap, bonnet nut, plasterguard and cover
(2) before soldering.
Connect valve body
to water supplies using the prop
er fittings.
Note: (3) is the cold inlet port and (4) is
the hot inlet port.
Solder a tube (5) from main outlet of the
jet module to the shower arm elbow to the
desired height.
Determine whether a three
or six function configuration is desired. For
2 port, 3 function; solder plug into auxiliary
port (6) in casting. For 3 port, 6 function;
all outlet ports are used. It is recommended
to mount valves to stringers as shown.
If you are making a back to back or reverse
installation (hot on right and cold on left)
install the valve body as described, but
reverse the water supply lines.
After soldering press in the detent (7) into
proper hole as shown, reinstall all other parts
in reverse order; ensure bonnet nuts are
tightened securely.
Then install the the stops
into the body; be careful not to overtighten
the nuts.
Note: Install stops in the w/stops version as
follows: Thread nut (8) on stem (9) as shown.
Then press stem and nut assembly into body
(10) and tighten using a 3/8", 6 point, deep
well socket. With a flat head screwdriver, adjust
stem clockwise to close and counterclockwise
to open.
R18222 & R18222-WS
8
9
2 Port, 3 Function
Installation
6
3 Port, 6 Function
Installation
1
2
3
4
7
5
5
9
8
10
7