DeLonghi PAC260 Air Conditioner User Manual


 
9
- Doors and windows of room to be air-condi-
tioned are closed (with the exception of tem-
porary installation where a partially opened
window is necessary).
- Shade the room as far as possible from
direct sunlight by drawing curtains and/or
lowering blinds or shutters, for economical
and efficient air-cooling.
- Ensure that intake and outlet vents (fig. 2 and
3) are not blocked.
- Make sure there are no sources of heat in the
room.
FINAL CHECK
In order to obtain the maximum performance from your air-conditioner make sure that:
1) Water collects at this point 2) Bend this section 3) Bend this section
NO YES YES
ELECTRICAL CONNECTION
Check that the power supply voltage is 115 V ~ 60 Hz.
Important: if you need to use and extension cord, please be sure to use
a heavy duty extension cord (minimum 14 gauge).
Before connecting the Pinguino to power supply, make sure that all
switches on the front control panel are in the OFF position.
Connect power cord found in storage compartment at rear of the
Pinguino.
fig. 10
fig. 11
fig. 12
fig. 13
fig. 14
fig. 15
Close the door.
Setting up and recommendations
SET UP INSTRUCTION
For permanent installation place the Pinguino near the outlet opening in wall or window (where it is meant
to be used). The diagram below shows the correct way to installl the exhaust hose.
PAC260GB 24-04-2003 16:33 Pagina 9